# Roof Edge Metal (Gravel Stop and Fascia)

> Formed sheet-metal perimeter trim on low-slope roofs, including gravel stops, fascias, drip edges and copings, which must resist wind uplift and is tested to ANSI/SPRI/FM 4435/ES-1.

- URL: https://roof.wiki/roof-edge-metal/
- Topic: Low-Slope & Flat Roof Systems
- Also known as: gravel stop; fascia system; metal edge; roof edge flashing; edge securement; coping cap; perimeter edge metal
- Regions: North America, Global
- First published: 2026-11-02 · Last reviewed: 2026-11-02
- Cite as: "Roof Edge Metal (Gravel Stop and Fascia)." roof.wiki. https://roof.wiki/roof-edge-metal/

## Key facts

- **Wind test standard:** ANSI/SPRI/FM 4435/ES-1 (tests RE-1, RE-2, RE-3)
- **First edition:** ANSI/SPRI ES-1, 1998
- **IBC requirement:** Since 2003 (1504.5); 2021 IBC Section 1504.6, slopes below 2:12
- **Share of BUR losses from perimeter failure (FM Global study):** 59%
- **Gutter test standard:** ANSI/SPRI GT-1 (2016)
- **Typical maximum section length:** 10–12 ft (3–3.7 m)

Roof edge metal is the formed sheet-metal trim that finishes and secures the perimeter of a low-slope roof. It includes **gravel stops**, with a raised lip that retains aggregate surfacing; **drip edges** and **fascia** systems, which turn down over the face of the building and throw water clear of the wall; and **copings**, which cap the top of a parapet wall. Beyond appearance and drainage, edge metal has a structural job: it clamps the edge of the roof membrane and, on many systems, holds the perimeter against wind. Because roof failures in storms so often begin at the edge, edge metal on commercial roofs in the United States must be tested to the wind standard ANSI/SPRI/FM 4435/ES-1.[2][3]

Roof edge metal belongs to the detailing of [low-slope roofs](https://roof.wiki/low-slope-roof/) and is a family of [roof flashing](https://roof.wiki/roof-flashing/). It differs from its siblings in that it terminates the roof at an open edge rather than sealing against a wall ([base flashing](https://roof.wiki/base-flashing/)) or around a penetration ([pitch pocket](https://roof.wiki/pitch-pocket/), [roof curb](https://roof.wiki/roof-curb/)). The [coping](https://roof.wiki/coping/) is the parapet-top member of the same family, and the [drip edge](https://roof.wiki/drip-edge/) used on steep-slope shingle roofs is a lighter relative.

## Components and types

- **Gravel stop.** An L-shaped or Z-shaped edge with a horizontal flange set on the roof and stripped in with membrane, and a raised lip that stops gravel or slag on built-up roofs being washed or blown off. Its face extends down over the fascia. One federal specification calls for a scupper wherever the stop rises more than 1 in (25 mm) above the roof, so that it does not dam water.[4]
- **Fascia systems.** A two-piece system in which a continuous cleat or anchor bar is fastened to the wood nailer and a snap-on fascia cover is hooked over it, giving a clean face with concealed fasteners. Fascia covers come in heights from a few inches to deep architectural profiles.[4][5]
- **Drip edge.** A simple one-piece edge with a kicked-out lower hem that drips water away from the wall face.
- **Fascia-cant systems**, which combine a sloping cant with the fascia so that the membrane turns up over a raised edge; one specification sets the cant at least 100 mm (4 in) above the roof.[4]
- **Copings.** Caps on parapet walls, fixed to anchor plates or cleats at intervals so that the cap is restrained on both faces. The International Building Code requires parapets to have a noncombustible, weatherproof coping at least as wide as the wall is thick.[6]
- **Scuppers and gutters** set through or along the edge to discharge water; gutters are tested separately to ANSI/SPRI GT-1.[3]

## Materials and dimensions

Typical materials are galvanised steel (ASTM A653, G90 coating), prefinished galvanised or Galvalume steel, aluminium sheet (ASTM B209), copper and stainless steel.[4] US public specifications give a sense of typical gauges: one calls for gravel stops and fascias of aluminium at least 2 mm (0.078 in) thick, coping caps of 1.6 to 3.2 mm (0.063 to 0.125 in) aluminium, 16 oz copper or 0.5 mm (0.018 in) stainless steel, maximum section lengths of 3,000 mm (10 ft), and corner legs at least 300 mm (12 in) long.[4] Another specifies 0.063 in (1.6 mm) aluminium copings, gravel stop sections no longer than 12 ft (3.7 m), concealed splice plates of matching material, coping supports at 24 in (610 mm) centres, and PVDF finishes containing at least 70 per cent fluoropolymer resin.[5] Both require the metal to accommodate thermal movement over a 120 °F (67 °C) ambient and 180 °F (100 °C) surface temperature range.[4][5]

Edge metal is fastened through its flange into a continuous treated wood nailer (blocking) securely anchored to the structure, or into a steel or concrete substrate. The strength of the nailer attachment is part of the edge design: ES-1 considers the integrity of the anchoring substrate as well as the metal itself.[1]

## Wind performance and the ES-1 standard

During high winds, suction is strongest at roof corners and perimeters. If the edge metal is pulled off, the membrane and insulation are exposed and begin to peel back, and the failure can spread across the whole roof.[2] An FM Global study of built-up roof losses found that 59 per cent occurred because the roof perimeter failed, and post-hurricane investigations by the Roofing Industry Committee on Weather Issues (RICOWI) found that membrane attachment cannot resist the loads once perimeter securement is lost.[3]

To address this, SPRI introduced ANSI/SPRI ES-1, *Wind Design Standard for Edge Systems Used with Low Slope Roofing Systems*, in 1998.[2][3] Its successor, ANSI/SPRI/FM 4435/ES-1, combined the standard with FM Global's 4435 approval standard in 2011, became a test-only standard for copings and fascias in 2017 and was updated in 2023; design guidance moved to the separate ANSI/SPRI ED-1 standard (2019).[3] The standard's three tests are:

- **RE-1**, which checks that the edge can hold a billowing membrane; it is required only for mechanically attached or ballasted membranes without a peel stop within 12 in (305 mm) of the edge.[2][3]
- **RE-2**, a full-size pull test, at least 8 ft (2.4 m) long, applying cyclic increasing outward load to the face of a fascia or edge until failure.[3]
- **RE-3**, a two-direction test of coping caps that pulls simultaneously up and out, in a vertical-to-horizontal load ratio of 1.73 to 1.00, cycled to failure.[3]

The measured resistance must equal or exceed the design wind pressure calculated for the building, which depends on wind speed, building height, exposure, occupancy and location of the edge on the roof.[1][2] The International Building Code first required edge securement designed to ES-1 in its 2003 edition, Section 1504.5; the 2012 edition named the RE-1, RE-2 and RE-3 tests; and the 2021 edition, Section 1504.6, applies the requirement to roofs with slopes below 2:12 and requires edge metal to be tested even where it does not secure the membrane.[1][3] Gutters are excluded from ES-1 but external gutters that secure the membrane must be tested to GT-1 under the 2021 IBC.[3] Where wind exposure is critical, some specifications also call for FM-approved copings of a stated wind class.[4]

## Installation

1. **Install nailers** of the correct height for the insulation thickness, anchored to the structure to resist the design uplift.[1]
2. **Terminate the membrane** at the edge, with a separate row of fasteners or peel stop where the membrane system requires it.[2]
3. **Set the edge metal**, either by fastening the flange through the membrane into the nailer at the tested spacing or by fastening a continuous cleat and hooking on the fascia cover; allow joint gaps for expansion, typically about 6 mm (1/4 in) at end joints.[4]
4. **Strip in the flange** with membrane, or heat-weld membrane-coated metal to single-ply roofs.
5. **Fit splice plates, corners and end caps**, and seal as required.[4][5]
6. **Install copings** on anchor plates or cleats, with joint covers and splice plates, sloping the top towards the roof where specified.[4]

The tested assembly must match the installed one: fastener type, spacing, metal thickness and cleat details all affect the rated resistance.[1]

## Failure modes and maintenance

Typical failures include edge metal and copings blown off in storms, starting a peel failure of the membrane; nailers pulled from the wall because of weak attachment; cracked or open laps from thermal movement; membrane strip-ins splitting at joints; galvanic corrosion where incompatible metals meet; and gutters torn away under wind or ice.[2][3][4] Regular inspection should check fasteners, joint covers, sealants and strip-in plies, especially after severe weather, and confirm that replacement metal is a tested, rated system.

## Sources

1. Why ES-1? A Quick Reference Guide — Tremco Roofing. https://tremcoroofing.com/media/Roofing/Shared%20Resources/Metal%20Edge/Why-ES-1-A-Quick-Reference-Guide.pdf
2. Working on the Cutting Edge — SPRI. https://www.spri.org/download/news__events/articles_archive/Working-on-the-Cutting-Edge.pdf
3. Edge Metal (2023 presentation) — SPRI. https://www.spri.org/wp-content/uploads/2023/10/4-2023-Edge-Metal_LeClare.pdf
4. VA Master Construction Specification 07 71 00 Roof Specialties — U.S. Department of Veterans Affairs / WBDG. https://www.wbdg.org/FFC/VA/VANCAS/VANCA077100.pdf
5. Master Specification 07 71 00 Roof Specialties — University of Houston Facilities. https://www.uh.edu/facilities-services/departments/fpc/master-specs/07-71-00-roof-specialties.pdf